Which check should define acceptance for our released gusset bracket?

SamAllen0333 · 2025年10月26日 19:12 UTC

已关闭
SA
SamAllen0333
I need the FR5 fixture brief to distinguish locating a bracket during welding from accepting the finished assembly. Our example is marked aligned in jig, then fails a released dimension. The production route also lists correction, with no time against it. Which comparison would expose what that operation is doing?

19 条回复

LU
LucyCarter1002

Use identified parts through the stages. I withdrew an in-fixture pass claim in another review because the photograph did not show a measurement. What does aligned mean on your sheet?

21
EM
EmmaBrown0898

And what released dimension failed? The correction may be addressing something other than the alignment the fixture operator checks.

8
SA
SamAllen0333

Lucy, aligned means the upright contacted the fixture stops. Emma, the released check is hole-axis position relative to the base. There is no corresponding in-fixture reading of that feature.

6
CH
ChloeBaker0483

Then don't ask the operator to defend a dimensional pass they never made. Their stop check can still be useful for explaining how the part was loaded.

0
LE
LeoChen1145

Put the actual supports beside the released readings. Otherwise before correction and after correction may use different setups and still end up in one attractive column.

19
LU
LucyCarter1002

Chloe, agreed. The useful question is whether the stops locate the incoming assembly as intended, followed by what the released part measures. Calling one check wrong does not supply the missing one.

5
SA
SamAllen0333

The operator is happy to show the fit-up check. He is less happy that the estimate treats correction as zero time. I have left that allowance open rather than carry forward the blank.

7
EM
EmmaBrown0898

That is reasonable, Sam, but do you know whether every assembly is corrected or only the ones that fail? The estimate will need that distinction.

8
CH
ChloeBaker0483

Emma, yes. We had a route instruction people signed even when they just checked and passed the part along. The tick did not mean they had worked on every one.

10
LE
LeoChen1145

A timed observation could record check-only and correction separately. Let the process and quality people define the trial, though; a stopwatch won't decide whether the method is suitable.

19
SA
SamAllen0333

There is no per-part correction record. The supervisor says some need it and some do not. We have asked fabrication and quality to define a small traceable comparison before timing the route.

13
LU
LucyCarter1002

Use the current drawing and incoming component revisions in that comparison. Our fixture review needed those too, because finished corrected examples could not explain the earlier fit-up.

6
EM
EmmaBrown0898

Sam, does the proposed fixture contact the same surfaces as the old one? I would keep that difference visible if it does not.

0
SA
SamAllen0333

Two contacts move in the proposal. The toolmaker has marked them on the current component drawing, revision E, and quality is defining the released check against assembly revision H.

23
LE
LeoChen1145

Good to have both revisions named. Are the retained parts actually to those component and assembly revisions?

17
CH
ChloeBaker0483

Leo's question is worth the nuisance. We found old stock used for a demonstration because it was already on the bench, while everyone discussed the new drawing.

6
SA
SamAllen0333

The retained example predates component E. It will stay as an old failure example, not the trial specimen. Current components have been selected for the planned comparison.

24
LU
LucyCarter1002

That leaves the trial able to answer the current fixture question. Keep the old failure and its different revision visible in the background, without asking it to justify the new contact arrangement.

7
SA
SamAllen0333

Trial plan is agreed, results still pending. The buying review now shows the fixture cost separately from an unresolved correction allowance. That is less convenient than the original estimate, but it is usable.

11