Our FR10 bracket request has no agreed clearing owner

ChloeAllen0309 · 2026年4月10日 16:09 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

CH
ChloeAllen0309
We can miss the ordinary bracket inspection request between scans in our FR10 setup, and the proposed replacement still has both the PLC and application clearing it, so I need an agreed handover before changing the signal design.

1 条回复

TH
ThomasBrooks0799

Have the two authors draw request, receipt and their clearing transitions on one sequence, including a delayed response. The monitoring view should observe those states without consuming them. Keep that ordinary job exchange distinct from the cell's safety functions