We can miss the ordinary bracket inspection request between scans in our FR10 setup, and the proposed replacement still has both the PLC and application clearing it, so I need an agreed handover before changing the signal design.
Our FR10 bracket request has no agreed clearing owner
ChloeAllen0309 · 2026年4月10日 16:09 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
1 条回复
讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .