steel blank reaches, open door still missing
AdaBell0651 · 2025年9月9日 19:38 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文
12 条回复
Our last review found the door frame mattered as much as the opening. Get the measured door position and full tool assembly into the same layout, with the held blank through the route.
14分Fitter is measuring the door. Tool drawing only has closed fingers so far.
5分Ask for open fingers and service fittings too. Or rather, ask for the assembly as it will actually be used, not a collection of outlines that each leave the awkward part to somebody else.
3分Requested. Adapter and hose fittings weren't in the first model either.
12分Include fixture-change access on that drawing. The setter still needs to get the tooling through the door.
10分Who will own the combined route check when all those drawings arrive?
1分Our integrator. Setter will review the same layout, not just the robot supplier's view.
14分Check the return to the supply tray as well, because a base position that improves entry may make the rest of the job awkward.
3分Full tool now clashes at the door handle. Integrator is comparing a changed approach and another base position.
3分If the base moves, maintenance should check the service panels at that proposed location too. It is much easier to question the drawing now than explain why a filter change needs dismantling later.
13分Has the setter tried their fixture trolley route at both candidates?
7分Not yet, Emma. Both candidates stay provisional until setter and maintenance reviews are done.