Our polymer-blank unloading study shows a reachable fixture, with the gripper replaced by a line. Open machine door missing too. Need a measured access review before arm selection; the proposed base also sits where our fixture trolley normally parks.
Give the setter the same base and tool revision the designer is checking, because reviewing trolley access beside an earlier smaller stand is a splendid way to get two incompatible approvals
Does the tool review include the blank held during withdrawal, and the gripper opening where required, rather than only a closed-tool position at the fixture?
Omar and Hassan, setter's changeover review rejected that base position. Moving it sideways is now a candidate for the complete access study. No arm selected; the rotated approach alone didn't settle the layout.