our ur5e packing price leaves training cover with nobody

KaiBrooks0802 · 2026年1月16日 22:57 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

KA
KaiBrooks0802
I have included fixtures and guarding in our packing estimate, but the supplier quotes training one operator while our supervisor assumes that person can train the other shift without any cover for their normal work.

2 条回复

LU
LuisBrown0956

Put both training methods in the estimate with the time and cover each needs. Ask who will assess the second shift's competence and support them afterwards. Passing on a demonstration is not automatically the same service as the supplier training both shifts.

20分
KA
KaiBrooks0802

The supervisor has priced cover for our internal trainer, and I have asked the supplier to quote the other shift directly as the alternative; neither is being treated as free now.

16分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .