I am reviewing gusseted-bracket records for a UR5e proposal, but the final column mixes clamped checks with released measurements; how can I establish whether the old fixture correction helped when the inspection condition changes between rows?
Don't throw the whole folder away though. We had old setup photos that showed a support had moved, even when the inspection sheets were hopeless. Anything identifying what changed could still help the fixture designer.
I found photographs with work-order references, but none records when the correction was introduced; they show the existing arrangement more clearly than the drawing does.
One support differs, so the designer will survey the fixture and review its contacts against the part drawing; the old performance claim remains unverified.
Our quality lead, working with the fixture designer; incoming fit-up, clamped checks and final released dimensions will be recorded separately in the proposed trial.