Missing released measurements in our bracket history

Simon_Bailey · 2025年4月23日 20:01 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

SI
Simon_Bailey
I am reviewing gusseted-bracket records for a UR5e proposal, but the final column mixes clamped checks with released measurements; how can I establish whether the old fixture correction helped when the inspection condition changes between rows?

16 条回复

AI
AishaArcher0431

Can you identify which rows are clamped?

24分
SI
Simon_Bailey

Only where the inspector wrote 'in jig'; the other rows have no condition noted.

11分
AI
AishaArcher0431

Leave the others unknown, then. Don't sort them by which values look plausible.

18分
NA
NathanBrooks0808

Who told you the correction helped? Is there a test record somewhere, or are you trying to put numbers behind something people remember saying?

17分
AI
AishaArcher0431

I'd like to know that too.

8分
SI
Simon_Bailey

The improvement claim is a note in the project summary, with no linked test; the operator who made the change has left.

17分
AI
AishaArcher0431

Then mark the claim unverified in your review.

15分
NI
NinaChen1197

Don't throw the whole folder away though. We had old setup photos that showed a support had moved, even when the inspection sheets were hopeless. Anything identifying what changed could still help the fixture designer.

8分
EM
EmmaBarnes0550

Are the photos tied to fixture revisions?

15分
NI
NinaChen1197

Ours were tied to a work order. No neat revision history, sadly. We could at least show which job used which support position.

6分
SI
Simon_Bailey

I found photographs with work-order references, but none records when the correction was introduced; they show the existing arrangement more clearly than the drawing does.

3分
NA
NathanBrooks0808

Does the current drawing even match the fixture, then? I'd sort that out before comparing its supposed performance.

10分
SI
Simon_Bailey

One support differs, so the designer will survey the fixture and review its contacts against the part drawing; the old performance claim remains unverified.

2分
AI
AishaArcher0431

Who will define the new released-part inspection?

11分
SI
Simon_Bailey

Our quality lead, working with the fixture designer; incoming fit-up, clamped checks and final released dimensions will be recorded separately in the proposed trial.

0分
AI
AishaArcher0431

That should make the next review less of an excavation.

18分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .