HarishAli0228
Our UR5e acceptance report adds another housing after reconnect, although completion was already high before the drop. I need to identify the earlier work behind it; clearing the bit or resending would only hide the uncertainty.

17 条回复

TO
TobyBarnes0579

Does the application store the completion before it loses connection?

23
LI
LindaBailey

Also check what the total means. Accepted housings, completed inspections, and received messages are different counts. A second inspection can be real without adding another accepted housing.

5
BE
BenAbbott0022

Linda's distinction matters even with perfect reconnect handling. Does this completion contain an acceptance decision, or merely say the inspection finished?

9
HA
HarishAli0228

It means inspection finished. Acceptance is a separate result record. The application saves that record before the drop, but reconnect currently increments the displayed accepted total from the high completion alone.

-1
EL
ElenaBennett0775

Then deduplicating completion still wouldn't make that an accepted-parts count.

20
RE
ReeceChan1080

Exactly. Harish, can you trace the saved result to the housing and inspection attempt independently of the row currently selected on screen? Otherwise fixing the increment may leave a wrong assignment underneath it

6
IM
ImranAbbott0044

What does the saved record say for the housing that triggered this report?

5
HA
HarishAli0228

It says accepted, with a housing identity and attempt identity. The next housing is selected on screen after reconnect, which is why the repeated completion looks like progress on that one.

9
CE
CeciliaChambers

There are two observations to preserve then. The total increases and the current selection makes the old event appear new. I would give the developer both screenshots with the saved result, rather than only asking for a counter patch.

7
JO
JordanBlair

And include a completed inspection whose result is rejected in the replay, because this accepted example alone conceals the meaning error.

14
HA
HarishAli0228

Developer is moving the total to the identified result records, not the completion callback. We have a replay with an accepted housing, a rejected housing and a repeated delivery; nothing is being resent to the cell.

-1
MA
MarkCarr

Will an absent result stay unknown, rather than become rejected?

2
HA
HarishAli0228
回复 MarkCarr

That case was added. Replay now leaves absent results pending and counts the accepted housing once. Reopening the report reconstructs the same total. The selected next housing no longer receives the old completion label.

14
LI
LindaBailey

Check a later accepted reinspection of the same previously rejected housing. It should change that housing's disposition under your quality rules, not pretend two physical housings existed. I mean the reporting test, not a request to reinspect production parts.

5
BE
BenAbbott0022

Quality needs to define which result governs that disposition. Latest arrival is not necessarily latest inspection after delayed delivery.

7
HA
HarishAli0228

That rule is not agreed yet. I've kept the patch out of the live report until quality reviews superseded attempts; the original reconnect replay passes, but the broader accepted total is not ready.

0
RE
ReeceChan1080

Fair enough. Keep the old inflated report available to whoever reconciles the shift figures, labelled as the affected version. A corrected future total does not explain the totals already copied into their notes