Retained completion attached to the next housing
HarishAli0228 · 2026年8月24日 14:15 UTC
17 条回复
Also check what the total means. Accepted housings, completed inspections, and received messages are different counts. A second inspection can be real without adding another accepted housing.
5分Linda's distinction matters even with perfect reconnect handling. Does this completion contain an acceptance decision, or merely say the inspection finished?
9分It means inspection finished. Acceptance is a separate result record. The application saves that record before the drop, but reconnect currently increments the displayed accepted total from the high completion alone.
-1分Then deduplicating completion still wouldn't make that an accepted-parts count.
20分Exactly. Harish, can you trace the saved result to the housing and inspection attempt independently of the row currently selected on screen? Otherwise fixing the increment may leave a wrong assignment underneath it
6分What does the saved record say for the housing that triggered this report?
5分It says accepted, with a housing identity and attempt identity. The next housing is selected on screen after reconnect, which is why the repeated completion looks like progress on that one.
9分There are two observations to preserve then. The total increases and the current selection makes the old event appear new. I would give the developer both screenshots with the saved result, rather than only asking for a counter patch.
7分And include a completed inspection whose result is rejected in the replay, because this accepted example alone conceals the meaning error.
14分Developer is moving the total to the identified result records, not the completion callback. We have a replay with an accepted housing, a rejected housing and a repeated delivery; nothing is being resent to the cell.
-1分Will an absent result stay unknown, rather than become rejected?
2分That case was added. Replay now leaves absent results pending and counts the accepted housing once. Reopening the report reconstructs the same total. The selected next housing no longer receives the old completion label.
14分Check a later accepted reinspection of the same previously rejected housing. It should change that housing's disposition under your quality rules, not pretend two physical housings existed. I mean the reporting test, not a request to reinspect production parts.
5分Quality needs to define which result governs that disposition. Latest arrival is not necessarily latest inspection after delayed delivery.
7分That rule is not agreed yet. I've kept the patch out of the live report until quality reviews superseded attempts; the original reconnect replay passes, but the broader accepted total is not ready.
0分Fair enough. Keep the old inflated report available to whoever reconciles the shift figures, labelled as the affected version. A corrected future total does not explain the totals already copied into their notes
9分