Retained completion attached to the next housing

HarishAli0228 · 24 Aug 2026, 14:15 UTC

Reply to discussion
HA
HarishAli0228
Our UR5e acceptance report adds another housing after reconnect, although completion was already high before the drop. I need to identify the earlier work behind it; clearing the bit or resending would only hide the uncertainty.

17 replies

TO
TobyBarnes0579
Replying to HarishAli0228

Does the application store the completion before it loses connection?

23 points
LI
LindaBailey
Replying to HarishAli0228

Also check what the total means. Accepted housings, completed inspections, and received messages are different counts. A second inspection can be real without adding another accepted housing.

5 points
BE
BenAbbott0022
Replying to LindaBailey

Linda's distinction matters even with perfect reconnect handling. Does this completion contain an acceptance decision, or merely say the inspection finished?

9 points
HA
HarishAli0228
Replying to BenAbbott0022

It means inspection finished. Acceptance is a separate result record. The application saves that record before the drop, but reconnect currently increments the displayed accepted total from the high completion alone.

-1 points
EL
ElenaBennett0775
Replying to HarishAli0228

Then deduplicating completion still wouldn't make that an accepted-parts count.

20 points
RE
ReeceChan1080
Replying to HarishAli0228

Exactly. Harish, can you trace the saved result to the housing and inspection attempt independently of the row currently selected on screen? Otherwise fixing the increment may leave a wrong assignment underneath it

6 points
IM
ImranAbbott0044
Replying to HarishAli0228

What does the saved record say for the housing that triggered this report?

5 points
HA
HarishAli0228
Replying to ImranAbbott0044

It says accepted, with a housing identity and attempt identity. The next housing is selected on screen after reconnect, which is why the repeated completion looks like progress on that one.

9 points
CE
CeciliaChambers
Replying to HarishAli0228

There are two observations to preserve then. The total increases and the current selection makes the old event appear new. I would give the developer both screenshots with the saved result, rather than only asking for a counter patch.

7 points
JO
JordanBlair
Replying to ElenaBennett0775

And include a completed inspection whose result is rejected in the replay, because this accepted example alone conceals the meaning error.

14 points
HA
HarishAli0228
Replying to JordanBlair

Developer is moving the total to the identified result records, not the completion callback. We have a replay with an accepted housing, a rejected housing and a repeated delivery; nothing is being resent to the cell.

-1 points
MA
MarkCarr
Replying to HarishAli0228

Will an absent result stay unknown, rather than become rejected?

2 points
HA
HarishAli0228
Replying to MarkCarr

That case was added. Replay now leaves absent results pending and counts the accepted housing once. Reopening the report reconstructs the same total. The selected next housing no longer receives the old completion label.

14 points
LI
LindaBailey
Replying to HarishAli0228

Check a later accepted reinspection of the same previously rejected housing. It should change that housing's disposition under your quality rules, not pretend two physical housings existed. I mean the reporting test, not a request to reinspect production parts.

5 points
BE
BenAbbott0022
Replying to LindaBailey

Quality needs to define which result governs that disposition. Latest arrival is not necessarily latest inspection after delayed delivery.

7 points
HA
HarishAli0228
Replying to BenAbbott0022

That rule is not agreed yet. I've kept the patch out of the live report until quality reviews superseded attempts; the original reconnect replay passes, but the broader accepted total is not ready.

0 points
RE
ReeceChan1080
Replying to HarishAli0228

Fair enough. Keep the old inflated report available to whoever reconciles the shift figures, labelled as the affected version. A corrected future total does not explain the totals already copied into their notes

9 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.