MayaAli0214 · 2026年5月7日 11:25 UTC

回复讨论
MA
MayaAli0214
One supplier offers a longer finger set to reach our existing inspection nest. The other offers a shorter tool but expects us to move the nest support. Both summaries justify the FR10 from housing mass alone, so I have asked for their complete loaded-tool details. The support move is not agreed. How do I keep that uncertainty visible without throwing away a potentially useful option?

19 条回复

IS
IsabelCarter0996

List the support change as part of that offer, with an owner and cost still to be agreed. Who is assessing whether the altered nest position works for inspection?

9
MA
MayaAli0214

Our inspection lead. She has the proposed position but not a section showing the tool releasing the housing. That is now requested from the supplier.

12
NO
NoraBennett0757

We nearly bought a shorter tool on the assumption that a bench could move, then found its services were fixed through the floor... ask the person who actually looks after that support before the cheaper column becomes the favourite.

21
AN
AnikaBrown0943

Unknown cost stays unknown. Don't put zero in because the spreadsheet wants a number.

8
AM
AmaraArcher0426

Do both quotes include the adapter and connections?

12
MA
MayaAli0214

Yes in the price, Amara, but not yet in the mass breakdown. Nora, maintenance has checked the support location; services can be rerouted, with that work added to the second offer.

7
IS
IsabelCarter0996

Keep the actual loaded centre of gravity and other required load data tied to the quoted assembly as well. Your integrator needs those for the intended movement, not a supplier's housing-only summary.

6
NO
NoraBennett0757

Is the move still worth considering after the extra work?

18
AN
AnikaBrown0943

Nora, she hasn't got a workable release view yet. Price can wait for that.

14
AM
AmaraArcher0426

I'd still collect the price. Might save assessing something we could never afford.

19
MA
MayaAli0214

Both are moving together. The release section shows the short tool fits, but the changed support puts the gauge access behind it. Inspection has rejected that position. The supplier is offering a further support revision, not a finished solution.

2
NO
NoraBennett0757

That was why I asked, Anika; endless redesign isn't free either, even before anyone cuts metal.

5
MA
MayaAli0214

The revised support restores gauge access, but it needs a larger base and costs more than the long-tool option. Both complete loaded assemblies are now with the integrator for assessment.

18
IS
IsabelCarter0996

Does the longer assembly leave room for the empty tool to withdraw and for the nest to be changed? Those could still decide it even if the load assessment is satisfactory.

13
AN
AnikaBrown0943

Fair enough, Nora. I read your price question as a vote for the unfinished option.

19
MA
MayaAli0214

The long-tool model covers both, with inspection and maintenance accepting the access. The integrator has accepted its defined load and motion proposal. We have chosen it and dropped the support move from this purchase.

12
AM
AmaraArcher0426

Did the final order keep the assessed tool revision?

23
MA
MayaAli0214

Yes, the order identifies that assembly and the existing nest revision, with installation and acceptance work included. Thanks, Amara. The generic lightweight-gripper description has been replaced.

17
NO
NoraBennett0757

Good to hear the existing nest won for an actual reason, rather than just being the thing nobody wanted to move.

11

参与讨论