Did anybody save the event history before removing it?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
UR5e sleeve-stop clip after the receiving tray was already removed
BrunoAllen0278 · 2026年2月16日 22:33 UTC
16 条回复
Not manually. Maintainer says the recorder may still have it. Video definitely shows the changed scene, not the original tray position.
9分Keep the video. Label what changed, rather than throwing away the only view you have.
14分Ask the package author which receiving condition the unloading step waits for, then have the maintainer find that condition around the occurrence. Tray removed afterwards is useful context, but it doesn't tell you whether it was seated correctly when the wait began.
19分And identify the tray that was there, not today's replacement.
22分We used to have wonderful fault clips ending with a hand pointing at the screen, while the useful message had disappeared before filming began; the recorder eventually saved us that performance, but only once someone checked which events it actually retained.
3分Who checked yours, Colin: the installer or your maintainer?
12分Keep the tray reference with the job identity. Our records once retained the attempt while the monitor invented a new run label after reconnect. The information was there, but the names made it easy to attach it to the wrong work.
6分Check the exported interval itself, including its lead-in. A successfully created file is not evidence that the needed events survived in the recorder.
22分Maintainer recovered the original attempt and identified tray. Trace shows seated confirmation disappearing before the wait. It includes the earlier normal transition too. Author has accepted that interval for investigation.
10分Our fixture looked home from the front while a rear contact wasn't made. Worth giving maintenance the intended seating detail, not only the signal name.
2分Compare that detail with the actual tray and confirmation hardware from this occurrence, because a lost signal can come from the physical seat or its sensing path and the trace alone doesn't choose between them.
22分Give the maintenance work a place in the production plan too. Otherwise everyone agrees to inspect it and the shift still expects another unexplained adjustment to keep the job going.
22分Inspection found damage to the receiving latch catch. Tray could look nearly home without reaching its intended seat. Fixture designer is specifying the replacement; this job remains held, with cover arranged for the maintainer.
20分Has the replacement arrived yet?
15分No. Identified and requested, not received. We have the captured condition and a physical finding now, but no repair or return result to report.
6分讨论已关闭
此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .