our bracket log has two passes and one unidentified checking jig

MayaAbbott0040 · 2026年1月14日 19:56 UTC

已关闭
MA
MayaAbbott0040
Two passes in our old bracket log. One clamped, one after correction. Neither names the checking jig. What can our FR5 fixture review actually use from that?

8 条回复

OW
OwenArcher0399

Try the original check sheets and whoever used the jig before drawing conclusions from the summary; you might recover its identity without repeating the whole study.

14
TH
TheoArcher0410

I'd be wary of choosing whichever pass makes the proposal look good. We had a planning figure travel through three presentations after its explanation vanished. By the third meeting everyone thought someone else had checked it. Different process, same annoying paperwork trick.

15
MA
MayaAbbott0040

Found the sheet. First pass is fit-up while restrained. Final pass belongs to the released bracket on the separate checking jig. Still no description of the correction between them.

9
AM
AmyAdams0119

Does the person who did the correction remember what they were handed? I'd ask with one actual bracket record in front of you, not send them a spreadsheet and hope for a memoir.

3
MA
MayaAbbott0040

Setter remembers the operation, not which of these brackets needed it. Useful explanation of the work. Not a count I can price.

17
OW
OwenArcher0399

Then the final check can stay linked to its bracket and jig, while the correction workload remains unknown; the missing count doesn't make the released check disappear.

2
MA
MayaAbbott0040

Agreed. Quality identified the jig and applicable drawing revision. We've removed the guessed correction allowance from the FR5 comparison and asked for a short observed run of the current method.

22
AM
AmyAdams0119

Include who waits for the checking jig. The actual correction may be quick and the queue horrible. Both matter if somebody has promised this job will fit comfortably between their other jobs.

17