Two passes in our old bracket log. One clamped, one after correction. Neither names the checking jig. What can our FR5 fixture review actually use from that?
Try the original check sheets and whoever used the jig before drawing conclusions from the summary; you might recover its identity without repeating the whole study.
I'd be wary of choosing whichever pass makes the proposal look good. We had a planning figure travel through three presentations after its explanation vanished. By the third meeting everyone thought someone else had checked it. Different process, same annoying paperwork trick.
Found the sheet. First pass is fit-up while restrained. Final pass belongs to the released bracket on the separate checking jig. Still no description of the correction between them.
Does the person who did the correction remember what they were handed? I'd ask with one actual bracket record in front of you, not send them a spreadsheet and hope for a memoir.
Then the final check can stay linked to its bracket and jig, while the correction workload remains unknown; the missing count doesn't make the released check disappear.
Agreed. Quality identified the jig and applicable drawing revision. We've removed the guessed correction allowance from the FR5 comparison and asked for a short observed run of the current method.
Include who waits for the checking jig. The actual correction may be quick and the queue horrible. Both matter if somebody has promised this job will fit comfortably between their other jobs.