What should a small fixture unloading pilot prove? (Fairino FR5)

JasperArcher0377 · 2026年5月13日 02:49 UTC

回复讨论
JA
JasperArcher0377
I proposed using Fairino FR5 for fixture unloading with a small plastic enclosure in a low-volume assembly workshop, starting with 114. My estimate covered the arm and gripper but left fixture work and staff effort unclear, which has frustrated my colleague. I'd like to define a small pilot that gives both of us a fair basis for judging the idea.

3 条回复

KA
KaiBrooks0802

Do your observations cover the manual workflow from preparation to completion? A transfer-only baseline could omit the same activities that made the initial budget incomplete.

6
JA
JasperArcher0377

The observed batch required more workpiece preparation time than transfer time. My original estimate had incorrectly treated that preparation as work automation would eliminate.

12
KA
KaiBrooks0802

@JasperArcher0377 Build a capped pilot around the complete workflow. Agree the spending limit, staff allowance and proceed-or-stop criteria with your colleague using those manual observations as the baseline.

2