What should a small fixture unloading pilot prove? (Fairino FR5)

JasperArcher0377 · 13 May 2026, 02:49 UTC

Reply to discussion
JA
JasperArcher0377
I proposed using Fairino FR5 for fixture unloading with a small plastic enclosure in a low-volume assembly workshop, starting with 114. My estimate covered the arm and gripper but left fixture work and staff effort unclear, which has frustrated my colleague. I'd like to define a small pilot that gives both of us a fair basis for judging the idea.

3 replies

KA
KaiBrooks0802
Replying to JasperArcher0377

Do your observations cover the manual workflow from preparation to completion? A transfer-only baseline could omit the same activities that made the initial budget incomplete.

6 points
JA
JasperArcher0377
Replying to KaiBrooks0802

The observed batch required more workpiece preparation time than transfer time. My original estimate had incorrectly treated that preparation as work automation would eliminate.

12 points
KA
KaiBrooks0802
Replying to JasperArcher0377

@JasperArcher0377 Build a capped pilot around the complete workflow. Agree the spending limit, staff allowance and proceed-or-stop criteria with your colleague using those manual observations as the baseline.

2 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.