Our brass-blank transfer proposal shows the FR5 reaching inside the machine, but the tool body is absent and the open door is outside the drawing. I don't see how we can accept a base position yet. What should I ask the integrator to bring to the layout review?
They can add the gripper, but the adapter is still an outline and the door survey isn't done. I've asked for both. The current reach picture seems too incomplete to price installation from.
Integrator owns the adapter design. Door survey is with our maintenance team. Both are in the review request now. Thanks for the ownership question; everyone had previously just said someone would supply the details.
That belongs in the review, but you can still compare clearly provisional candidates while the survey is being completed. I mean compare options and missing information, not approve the base or assume the existing drawing has proved access.