简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The bracket pass was measured before the clamps came off

HenryBrooks0786 · 2025年12月27日 15:55 UTC

已关闭
HE
HenryBrooks0786
Our FR10 proposal calls the old bracket trial a pass. The released check underneath says otherwise. What gives?

13 条回复

NA
NadiaCarter0987

Which check does the heading refer to, Henry? The fixture may have held the bracket in the intended position while the released piece still failed its drawing requirement.

14
HE
HenryBrooks0786

Heading says fixture trial passed. Sales copied that as bracket accepted. Same page has the released failure

7
JU
JuliaBaker0500

Ask them to change the summary. You don't need to prove the fixture useless to point out that the released bracket failed. Those are different claims, and a buyer shouldn't need to hunt underneath the headline to find the awkward one.

23
EM
EmmaBennett0724

Check what the released measurement used as its reference too. I've had a bracket reading taken from the bench while the drawing used the mounting face. A failure entry still needs an intelligible method.

-6
NA
NadiaCarter0987

Emma, would you keep the failure visible while that method is being checked? I would not want an unanswered measurement question to revive the original acceptance claim.

15
EM
EmmaBennett0724

Yes, leave it visible. I'm asking what the reading means, not suggesting they rub it out.

10
HE
HenryBrooks0786

Quality has the method question. Sales has agreed bracket acceptance isn't established. Much better than arguing about the headline

21
FA
FarahBrown0939

Does the old sheet mention any later correction, Henry, or does it end at that released check?

8
HE
HenryBrooks0786

Later pass in a separate column. No note about what happened between. That's another hole

18
JU
JuliaBaker0500

Put the gap beside that later number. I wouldn't let anyone turn it into either 'the fixture fixed it' or 'the operator always has to fix it'. You haven't got the route between the two results yet.

17
NA
NadiaCarter0987

For the current proposal, could quality and fabrication agree an observation that follows one identified bracket through fit-up, restraint, release and any further work? That would answer a more useful question than another round of editing the old heading.

22
HE
HenryBrooks0786

They've agreed those stages for a current trial. No trial result yet. Thanks Julia for the wording on that gap

7
FA
FarahBrown0939

Will the person doing any correction add their note directly, rather than somebody guessing it from the final inspection time?

23

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .