简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Separating fit-up, restraint and final inspection

JoBell0679 · 2026年8月6日 23:56 UTC

回复讨论
JO
JoBell0679
I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Fairino FR10 and a steel gusseted bracket assembly in a precision fabrication quality department. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.

1 条回复

TH
TheoAllen0323
回复 JoBell0679

Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?

18

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。