I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Fairino FR10 and a steel gusseted bracket assembly in a precision fabrication quality department.
The notes describe alignment under restraint but dimensions outside the drawing requirement after release.
I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.
Separating fit-up, restraint and final inspection
JoBell0679 · 2026年8月6日 23:56 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文