I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Fairino FR10 and a steel gusseted bracket assembly in a precision fabrication quality department.
The notes describe alignment under restraint but dimensions outside the drawing requirement after release.
I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.
Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?