Separating fit-up, restraint and final inspection

JoBell0679 · 6 Aug 2026, 23:56 UTC

Reply to discussion
JO
JoBell0679
I'm reviewing historical records for our planned reviewing fixtures for welded mounting brackets with Fairino FR10 and a steel gusseted bracket assembly in a precision fabrication quality department. The notes describe alignment under restraint but dimensions outside the drawing requirement after release. I'd like to distinguish incoming fit-up, fixture location and final acceptance before carrying an unexplained correction routine into the new cell; no live welding adjustments are involved.

1 reply

TH
TheoAllen0323
Replying to JoBell0679

Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?

18 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.