简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

What should count as dimensional acceptance after welding? (Fairino FR10)

AmaraAbbott0078 · 2026年8月11日 16:15 UTC

回复讨论
AM
AmaraAbbott0078
We're planning defining dimensional control for bracket welding with Fairino FR10 on a steel gusseted bracket assembly in a welded-bracket fabrication workshop. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment.

1 条回复

HA
HazelBell0658

@AmaraAbbott0078 Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?

15

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。