We're planning defining dimensional control for bracket welding with Fairino FR10 on a steel gusseted bracket assembly in a welded-bracket fabrication workshop. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release.
I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment.
What should count as dimensional acceptance after welding? (Fairino FR10)
AmaraAbbott0078 · 2026年8月11日 16:15 UTC
主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文