What should count as dimensional acceptance after welding? (Fairino FR10)

AmaraAbbott0078 · 11 Aug 2026, 16:15 UTC

Reply to discussion
AM
AmaraAbbott0078
We're planning defining dimensional control for bracket welding with Fairino FR10 on a steel gusseted bracket assembly in a welded-bracket fabrication workshop. Our old inspection notes say it looks aligned while restrained, then falls outside the drawing requirement after release. I want to untangle fit-up, fixture location and final inspection before our new cell inherits an unexplained correction routine. This is a records review, not live welding adjustment.

1 reply

HA
HazelBell0658
Replying to AmaraAbbott0078

@AmaraAbbott0078 Compare the specified inspection condition and reference supports with the historical sheets. Do individual measurements identify whether the assembly was restrained or released?

15 points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.