Which fixture detail should accompany our FR10 connector wait?

EllaBell0642 · 2025年12月11日 18:22 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

EL
EllaBell0642
Our FR10 connector-unloading clip includes the waiting step now, but the seller is discussing a two-clamp fixture. We have one clamp and a separate presence check. What should make that difference unmistakable?

6 条回复

FA
FarahBarnes0591

Send a clear view naming the actual clamp and presence device, with the fixture identity and active job version. I had a connector clip where the missing context mattered more than another angle on the arm. Ask support to describe the wait for this arrangement.

8分
EL
EllaBell0642

Thank you Farah. Their reply used an older fixture drawing. They have the current one now, with both devices identified in the photograph.

11分
AN
AnnaBennett0764

Have them name the current drawing revision in their answer. A new attachment can sit underneath an old explanation for a surprisingly long time.

9分
EL
EllaBell0642

They confirmed revision F and identified the presence confirmation as the condition behind the captured wait. Our technician is checking the retained sequence for that occurrence.

0分
FA
FarahBarnes0591

Does the retained sequence show the request before that wait as well as the confirmation state? It will matter if support is deciding whether the missing condition was actually expected at that point.

17分
AN
AnnaBennett0764

Farah's question is worth answering before another site visit is priced. Ella has corrected the fixture misunderstanding; that does not automatically mean the remaining evidence can explain the stop.

17分