简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Can't clear the FR5 mounting proposal without the tool drawing

HazelAdams0136 · 2025年4月14日 09:03 UTC

已关闭
HA
HazelAdams0136
Our FR5 mill proposal shows a reachable steel blank, no gripper body and no parked door. Tool supplier says details follow after order. Not enough for an access decision. What deliverable should I request first?

5 条回复

MA
MayaChen1171

Can they supply a committed tool envelope before detailed design? It needs to cover the actual assembly and its working states. 'We'll make it fit' isn't a drawing you can review.

12
HA
HazelAdams0136

They can provide an envelope with exclusions. Cable routing excluded.

19
MA
MayaChen1171

Then use it to narrow the layout, with that hole in the information stated. Who is responsible for the final routing check?

11
HA
HazelAdams0136

Integrator now owns the complete check. Envelope rejected one position; no final approval yet.

21
MA
MayaChen1171

What did the envelope hit?

13

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .