Can't clear the FR5 mounting proposal without the tool drawing

HazelAdams0136 · 14 Apr 2025, 09:03 UTC

Closed
HA
HazelAdams0136
Our FR5 mill proposal shows a reachable steel blank, no gripper body and no parked door. Tool supplier says details follow after order. Not enough for an access decision. What deliverable should I request first?

5 replies

MA
MayaChen1171
Replying to HazelAdams0136

Can they supply a committed tool envelope before detailed design? It needs to cover the actual assembly and its working states. 'We'll make it fit' isn't a drawing you can review.

12 points
HA
HazelAdams0136
Replying to MayaChen1171

They can provide an envelope with exclusions. Cable routing excluded.

19 points
MA
MayaChen1171
Replying to HazelAdams0136

Then use it to narrow the layout, with that hole in the information stated. Who is responsible for the final routing check?

11 points
HA
HazelAdams0136
Replying to MayaChen1171

Integrator now owns the complete check. Envelope rejected one position; no final approval yet.

21 points
MA
MayaChen1171
Replying to HazelAdams0136

What did the envelope hit?

13 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .