Arm and gripper priced. Fixtures still vague. - fixture unloading

LinBennett0705 · 2026年5月19日 04:35 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

LI
LinBennett0705
I proposed using Fairino FR10 for fixture unloading with a small plastic enclosure in a compact contract manufacturing shop, starting with 170. My estimate covered the arm and gripper but left fixture work and staff effort unclear, which has frustrated my colleague. I'd like to define a small pilot that gives both of us a fair basis for judging the idea.

6 条回复

LI
LiamBennett0751

Have you measured the whole manual job, preparation included? Timing just the transfer could hide the same missing labour again.

8分
LI
LinBennett0705

@LiamBennett0751 We watched a batch. Preparation took longer than transfer. My estimate had basically made that work disappear by wishing.

11分
LI
LiamBennett0751

@LinBennett0705 Build a capped pilot around the complete workflow. Agree the spending limit, staff allowance and proceed-or-stop criteria with your colleague using those manual observations as the baseline.

22分
LI
LinBennett0705

Should the allowance include my own fixture development even though I'm interested in doing it? It would still be an additional commitment beyond my existing work.

14分
EL
ElliotCarter1031

We counted it on our own pilot. Enjoying the fixture design didn't make the production work waiting behind it disappear. That was an awkward spreadsheet

19分
LI
LiamBennett0751

You can value every manual minute removed at the labour rate. That gives you a straightforward saving to compare with the pilot cost.

13分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。