简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

my FR5 carton review needs the conditions behind each approval

FarahCarter1026 · 2026年8月23日 19:15 UTC

回复讨论
FA
FarahCarter1026
I need the filled component-case bearing regions and complete tool exit assessed together. Our alternating FR5 layer puts some rotated supports over gaps. What should each reviewer state before I accept their approvals as compatible?

1 条回复

NA
NadiaBrown0900

Are packaging and tooling reviewing the same packing revision, pallet deck, placement order and permitted partial loads? I'd ask each to list its assumptions beside its conclusion. Two approvals can both be sincere and still describe different arrangements, which leaves the operator with the disagreement later.

20

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。