Restrained bracket alignment and released acceptance are mixed in our notes

HassanAli0182 · 2026年6月13日 10:19 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HA
HassanAli0182
Old UR5e proposal notes mix fit-up, restrained alignment and failed released dimensions. How should I separate the checks?

3 条回复

AN
AnnaAllen0329

Find out what each check actually measured and which assembly it belongs to. I would also ask where the correction step sits. Our old notes once quoted final accepted readings without saying the part had already been straightened.

9分
HA
HassanAli0182

Our correction note is also before final inspection. No paired pre-correction reading recorded.

13分
AN
AnnaAllen0329

Then the amount of correction is unknown from that record. Have fabrication and quality define a current-assembly study that includes the untouched released condition, rather than importing the old accepted number as evidence of what the proposed fixture achieves.

5分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。