Which bracket measurement should our new fixture review start from?
MayaBarnes0562 · 2025年9月8日 19:58 UTC
19 条回复
Inspector knows of a sample box. Label just says brackets, which is promisingly vague.
7分Can its contents be linked to the batch and drawing revision under review? A retained piece without that link may not answer your missing measurement.
16分I'd price a small current-sample check while you search, because this can turn into a long hunt for data nobody recorded
-4分DineshBennett, requested that estimate. Harish, the inspector is checking the box history before we use anything.
8分Keep the old route useful for what it can tell you too; knowing every batch visited correction still matters to planning, even if the individual before readings are gone.
9分Has the new fixture designer seen the actual old checking arrangement? I would ask that before deciding the missing number is the only question left.
19分Not yet, Lucy. Old checking block is stored with inspection. Designer has only the drawing.
7分Which revision is that drawing, Maya? Earlier you mentioned a proposal, but not whether it uses the same bracket revision as the old records.
14分Old record and checking-block drawing reference C. Proposed bracket is E. Slot position changed at D.
13分Have the designer review that change against the checking contacts. Don't ask someone to measure E on the old block merely because it fits there.
8分Include defining the current measurement setup in that sample-check estimate, otherwise we're pricing a number without agreeing how to obtain it
0分The box is all corrected samples, inspector confirms. Useful to know, annoying to find nothing untouched.
15分At least that stops the box being used as before evidence; will the current trial keep individual identities from the first released check onward?
2分Yes. First release, any correction, then final check under the agreed method. Each piece stays identified.
16分Is that method agreed now, or part of the trial request? I cannot tell from your last update.
16分Part of the request, Harish. Wrote that too firmly. Inspection and designer still have to agree it.
11分Then keep the sample measurement waiting on that agreement. You can still finish the records summary without pretending the new method is ready.
15分Done. Old history summarised, current method still pending. Thanks DineshAdams for the retained-piece question; it stopped that box becoming our answer by default.