Which bracket measurement should our new fixture review start from?

MayaBarnes0562 · 8 Sept 2025, 19:58 UTC

Closed
MA
MayaBarnes0562
I've found the after-correction height, but still no first released reading for our FR5 bracket proposal. What now?

19 replies

DI
DineshAdams0125
Replying to MayaBarnes0562

Can the person who made the original checks identify any retained pieces from before correction, rather than having you search the accepted stock for something that looks representative?

7points
MA
MayaBarnes0562
Replying to DineshAdams0125

Inspector knows of a sample box. Label just says brackets, which is promisingly vague.

7points
HA
HarishAllen0315
Replying to MayaBarnes0562

Can its contents be linked to the batch and drawing revision under review? A retained piece without that link may not answer your missing measurement.

16points
DI
DineshBennett0734
Replying to MayaBarnes0562

I'd price a small current-sample check while you search, because this can turn into a long hunt for data nobody recorded

-4points
MA
MayaBarnes0562
Replying to DineshBennett0734

DineshBennett, requested that estimate. Harish, the inspector is checking the box history before we use anything.

8points
DI
DineshAdams0125
Replying to MayaBarnes0562

Keep the old route useful for what it can tell you too; knowing every batch visited correction still matters to planning, even if the individual before readings are gone.

9points
LU
LucyCarter1002
Replying to MayaBarnes0562

Has the new fixture designer seen the actual old checking arrangement? I would ask that before deciding the missing number is the only question left.

19points
MA
MayaBarnes0562
Replying to LucyCarter1002

Not yet, Lucy. Old checking block is stored with inspection. Designer has only the drawing.

7points
HA
HarishAllen0315
Replying to MayaBarnes0562

Which revision is that drawing, Maya? Earlier you mentioned a proposal, but not whether it uses the same bracket revision as the old records.

14points
MA
MayaBarnes0562
Replying to HarishAllen0315

Old record and checking-block drawing reference C. Proposed bracket is E. Slot position changed at D.

13points
LU
LucyCarter1002
Replying to MayaBarnes0562

Have the designer review that change against the checking contacts. Don't ask someone to measure E on the old block merely because it fits there.

8points
DI
DineshBennett0734
Replying to MayaBarnes0562

Include defining the current measurement setup in that sample-check estimate, otherwise we're pricing a number without agreeing how to obtain it

0points
MA
MayaBarnes0562
Replying to MayaBarnes0562

The box is all corrected samples, inspector confirms. Useful to know, annoying to find nothing untouched.

15points
DI
DineshAdams0125
Replying to MayaBarnes0562

At least that stops the box being used as before evidence; will the current trial keep individual identities from the first released check onward?

2points
MA
MayaBarnes0562
Replying to DineshAdams0125

Yes. First release, any correction, then final check under the agreed method. Each piece stays identified.

16points
HA
HarishAllen0315
Replying to MayaBarnes0562

Is that method agreed now, or part of the trial request? I cannot tell from your last update.

16points
MA
MayaBarnes0562
Replying to HarishAllen0315

Part of the request, Harish. Wrote that too firmly. Inspection and designer still have to agree it.

11points
LU
LucyCarter1002
Replying to MayaBarnes0562

Then keep the sample measurement waiting on that agreement. You can still finish the records summary without pretending the new method is ready.

15points
MA
MayaBarnes0562
Replying to DineshAdams0125

Done. Old history summarised, current method still pending. Thanks DineshAdams for the retained-piece question; it stopped that box becoming our answer by default.

11points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .