Which released bracket measurement belongs in our FR5 fixture brief?

CarlaAbbott0053 · 2025年10月17日 10:01 UTC

已关闭
CA
CarlaAbbott0053
I found two inspection sheets for our gusseted support bracket. One says square in jig. The other gives an out-of-tolerance hole-to-base measurement after the part was removed. Neither identifies the bracket, so I cannot tell whether they describe the same piece. Our FR5 fixture proposal cites them as a before-and-after comparison. I would rather ask inspection one useful question now than commission a fixture around a story we cannot trace. Is there anything worth recovering from these sheets?

9 条回复

SA
SarahBrooks0850

We once recovered a link from a job traveller kept outside the inspection folder, so I would ask whether the sheet numbers appear on anything that identifies the batch or part.

19
FA
FarahAli0243

Even if they match, square in jig may refer to another feature. Ask what was actually checked.

9
CA
CarlaAbbott0053

The traveller links both sheets to the same batch, Sarah, but not an individual bracket. Farah, the jig check was a stop-contact check. It did not measure hole-to-base distance.

24
SA
SarahBrooks0850

Then my traveller suggestion only got you partway, and Farah's point explains why joining the two readings would still be misleading.

16
FA
FarahAli0243

Keep the failed final measurement available. I mean do not discard it with the attempted comparison; someone still needs to account for that failure when planning the work.

6
CA
CarlaAbbott0053

That is the useful split. I have removed the before-and-after claim from our brief and left the final failure as an unresolved example. We are asking inspection to choose a current comparison on identified parts.

10
SA
SarahBrooks0850

Carla, will that comparison use the same drawing revision as the new fixture brief, or does the old sheet predate a change?

11
CA
CarlaAbbott0053

Both use revision F. The old sheet states it, and I checked the proposal attachment. Thank you for pushing the traceability question before we built a convincing chart from unrelated checks.

17
FA
FarahAli0243

Does the current route include a correction operation before final inspection? That would need to appear in the comparison too.

14