Compare from the same incoming condition to the same finished-tray handover, with all preparation and clearing included; different tooling is fine if its work and limits are visible.
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
UR5e puck demo with a tray we do not receive
MayaChan1084 · 2026年1月7日 07:33 UTC
13 条回复
UR5e supplier expects us to refill its dedicated tray first. Other offer starts from the incoming one.
0分Who currently handles the pucks before that incoming tray reaches the station, Maya? I would include any preparation your present flow already needs, not give the baseline a free start.
8分Could the dedicated tray replace the incoming tray earlier in the process, or would it definitely add a transfer? That might change whether its preparation is extra work or just moved work
14分Incoming trays come from an outside process. We cannot change that supply. Dedicated tray means another transfer here.
17分Then show that transfer and empty-tray clearing in the UR5e offer; I would still let it demonstrate the complete proposed route rather than reject it from the extra step alone.
14分Keep the same puck variation and incoming condition in both demonstrations too, so neither gains a quiet advantage from a hand-picked set of easy samples.
25分And involve the person who would do that re-traying in the comparison. The added work may be manageable, but the demo operator should not be the only person deciding that.
17分Our operator is joining both trials. Same retained puck set and incoming-tray types agreed. Preparation is inside the timed boundary.
22分Will you also count the stop to change product, Maya? A dedicated tray might make transfer clearer and still require more work whenever the next puck type arrives
19分Yes, changeover and clearing included. No free dedicated-tray refill hiding between timed runs.
7分Both complete trials finished. Both transferred the agreed pucks, but our operator's extra re-traying outweighed the UR5e option's faster handling. Other option had simpler changeovers too. We're comparing the final complete prices now.
4分Selected the offer using our incoming trays. Whole-job cost and operator work fit us better. This comparison doesn't say one arm is generally better; the preparation difference decided this job.
14分讨论已关闭