Bracket movement calculated from different assemblies

Eli_Bowen · 2026年1月18日 23:01 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

EL
Eli_Bowen
The summary for our UR5e fixture proposal subtracts a clamped reading from a released reading and calls the difference movement. I traced the two sheets: same production batch, different bracket identifiers. One also went through correction before its final check. Which parts of this old comparison remain useful?

6 条回复

NI
NinaBrown0936
回复 Eli_Bowen

The individual checks may still be useful. The subtraction isn't a before-and-after result for either bracket. Can inspection identify what was measured and at which stage for each one?

14分
EL
Eli_Bowen

Yes. The released reading is before correction and fails the specified upright dimension. Its later final check passes. The clamped reading belongs to another identified bracket with no released measurement retained.

8分
MA
MayaAdams0127
回复 Eli_Bowen

Keep those two histories apart, because I'd hate a new fixture to be justified by movement that only exists in the spreadsheet.

24分
NI
NinaBrown0936
回复 Eli_Bowen

And don't infer that the second bracket needed correction simply because the first did. I would take these as examples of what the new study must follow on the same identified assembly, not a measured correction rate.

15分
MA
MayaAdams0127

Nina, agreed. Eli, does the proposed fixture change the contacts involved in that failed dimension, or is that connection still unexplained?

18分
EL
Eli_Bowen

Still unexplained. The designer has withdrawn the movement calculation from the proposal. Inspection has reconstructed the failed bracket's released check, correction and final check as one history. That gives us a real failure example, but the proposed contact changes still need their own assessment.

12分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .