Our FR5 panel report begins after somebody separates the sheet

EllaAllen0294 · 2026年4月1日 15:27 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

EL
EllaAllen0294
The proposed tool seals on a thin aluminium enclosure panel, but the bench report starts with one panel already clear of the stack. Our job starts at the stack and ends in an assembly nest. I need separation, support and release covered before putting a staffing figure beside the FR5 proposal.

16 条回复

HA
HazelChan1093

Ask who separated that sample. Then send a representative stack and the actual receiver details for a full comparison. Include how the system establishes one panel, and how the released panel sits afterwards. The person peeling sheets apart must not disappear just because the camera starts later.

6分
EL
EllaAllen0294

Demonstrator separated it by hand. Supplier acknowledges the report only covers contact on one panel. They are proposing a stack trial with our samples.

8分
JA
JamieBrown0904

Could manually separated presentation be a useful alternative? I would compare it if your orders are small, but include the person's preparation and replenishment time rather than treating it as free.

20分
MI
MinaArcher0424

Also check what else that person does while the trial runs. A brief task can still conflict with assembly work at exactly the wrong moment.

5分
EL
EllaAllen0294

We will compare both. The assembly operator would do manual separation, and already covers inspection, so we are including that overlap in the observation.

20分
FI
FionaAli0238

What does the proposed extra-panel check show the operator when it cannot decide? I'd want that example in the handover, not only one green single-sheet indication.

-2分
HA
HazelChan1093

Fiona's question belongs in the trial brief. Have the supplier show known single, double and uncertain cases with your panels, and define the response without assuming an uncertain grip can proceed.

11分
JA
JamieBrown0904

And keep the manual option honest about doubles too. A person presenting sheets doesn't make a second sheet physically impossible.

-1分
EL
EllaAllen0294

Both briefs include that. Supplier has our panels and nest details. We have not accepted either feed arrangement yet.

9分
MI
MinaArcher0424

Does the panel-support comparison use the same nest in both options? Otherwise you may be comparing a prepared single panel with an easier destination as well.

14分
EL
EllaAllen0294

Same nest. First stack trial found a double pickup, which its proposed check detected. The single panel reached the nest with a raised corner, so support through release needs attention.

8分
HA
HazelChan1093

Have them compare the released panel condition before changing the nest to pull it flat. It matters whether the handling changed the panel or the current supports simply fail to let it settle.

10分
FI
FionaAli0238

Did they show the uncertain indication as well, Ella?

19分
EL
EllaAllen0294

Yes, using a deliberately ambiguous test sample; it held for review. On the corner issue, the accepted single panel was flat before handling and after removal, but did not settle on the proposed receiving supports.

4分
JA
JamieBrown0904

That sounds worth taking to the support designer with the actual panel. Don't let a successful double check close a separate landing problem.

5分
EL
EllaAllen0294

Designer is reviewing the contact arrangement. Both feed options remain open, with their labour observations retained; no change to the panel specification or acceptance of the FR5 tool yet.

8分

讨论已关闭