简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Which FR10 connector attempt belongs with this fixture-loading stop?

OliverBarnes0537 · 2026年5月4日 08:19 UTC

回复讨论
OL
OliverBarnes0537
Fourteen days into our connector ticket, I have the FR10 job and physical fixture identities, but the phone clip and exported trace may cover different attempts. What shared event should the author use to align them?

2 条回复

TH
TheoArcher0410

Ask the author for an event visible in both, such as an identified selection acknowledgement, and retain the attempt reference with the trace. I would first check the earlier footage rather than try to reconstruct it from the stopped pose.

13
OL
OliverBarnes0537

Author matched the fixture-selection acknowledgement and recovered the correct attempt. Trace shows availability dropping after the fixture was seated. Maintenance has that occurrence and is inspecting the actual confirmation source.

8

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。