Which FR10 connector attempt belongs with this fixture-loading stop?

OliverBarnes0537 · 4 May 2026, 08:19 UTC

Reply to discussion
OL
OliverBarnes0537
Fourteen days into our connector ticket, I have the FR10 job and physical fixture identities, but the phone clip and exported trace may cover different attempts. What shared event should the author use to align them?

2 replies

TH
TheoArcher0410
Replying to OliverBarnes0537

Ask the author for an event visible in both, such as an identified selection acknowledgement, and retain the attempt reference with the trace. I would first check the earlier footage rather than try to reconstruct it from the stopped pose.

13points
OL
OliverBarnes0537
Replying to TheoArcher0410

Author matched the fixture-selection acknowledgement and recovered the correct attempt. Trace shows availability dropping after the fixture was seated. Maintenance has that occurrence and is inspecting the actual confirmation source.

8points

Add to the discussion

Welcome to Application Robot

Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.

Forgot your password?

By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.