Our FR10 arrived with packing pressed into the tool interface cover

HarishAbbott0054 · 2026年2月12日 17:55 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

HA
HarishAbbott0054
I have left our delivered FR10 unpowered. A displaced timber support pressed into the tool interface cover and left a visible indentation. Seller suggests trying it. I would prefer an assessment that addresses the impact.

19 条回复

JO
JonasArcher0372

Ask their service contact for an inspection scope covering that impact area before power-up. Send the arrival views, not only the close-up of the cover.

12分
HA
HarishAbbott0054

Sent both. The seller offered a replacement cover but has not addressed anything beneath it. I have asked service whether the proposed inspection covers the interface assembly too.

12分
BR
BrunoBarnes0539

Was the timber still touching the cover in your arrival photograph, or are you reconstructing where it hit?

14分
OM
OmarAli0230

A new cover alone would make me uneasy here. It could tidy up the one visible clue while leaving you with the same unanswered impact question. Have they named the person doing the assessment?

19分
HA
HarishAbbott0054

Bruno Barnes, still touching in the photograph. Omar, no assessor named yet. The replacement offer came from sales rather than service.

19分
BR
BrunoAllen0278

Who is dealing with installation planning while that answer is missing? I'd avoid giving the workshop a date based on the cover arriving.

25分
JO
JonasArcher0372

Keep the existing cover with the assessment. I wouldn't let a cosmetic replacement become the whole job description.

-2分
HA
HarishAbbott0054

I own the installation plan, Bruno Allen. It stays unscheduled. Service has now proposed a local inspection of the cover, its mounting and the adjacent interface assembly.

10分
BR
BrunoBarnes0539

Will the assessor see the original packing photographs as well?

21分
OM
OmarAli0230

And has somebody agreed the visit cost? Worth having that conversation before the assessor turns up and everyone discovers they expected someone else to pay.

25分
HA
HarishAbbott0054

Yes, Bruno Barnes, the photographs are attached to the service case. Omar, seller confirmed it will cover the agreed inspection visit. Local technician has accepted the job.

16分
BR
BrunoAllen0278

That sounds like a real step forward.

3分
JO
JonasArcher0372

Have them state any limits to what the local inspection can establish. Some findings may still call for workshop assessment.

20分
BR
BrunoBarnes0539

Harish, has the visit happened now?

6分
OM
OmarAli0230

I'm interested too. The indentation looked like a simple cover issue in your description until the timber contact became clear.

8分
HA
HarishAbbott0054

Inspection happened. Cover mounting is deformed, and the technician wants the interface assembly assessed at service facilities. No powered check was performed. Seller is arranging collection rather than sending only a cover.

11分
BR
BrunoAllen0278

Have they supplied packing instructions that account for the damaged internal support?

16分
JO
JonasArcher0372

Use their reviewed packing arrangement for the return. Reusing the displaced timber in its original role would need an answer, not optimism.

24分
HA
HarishAbbott0054

Service supplied a revised packing plan and replacement supports. Collection is booked, not completed. Thank you, Jonas, for keeping the inspection about the impact rather than the appearance of the cover.

24分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .