I'm reviewing records for planned FR5 gusset-bracket welding. Restrained alignment passes visually, released dimensions fail. What evidence separates fit-up, location and final acceptance before we inherit an unexplained correction?
Can you link a restrained check and a released measurement to the same bracket, drawing requirement and measurement support, rather than compare two general notes?
Include incoming fit-up and the fixture configuration in that request, so the later reviewer can distinguish where the part was located from how its released dimensions were accepted.