Who promoted that sketch into a recommendation?
简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。
our fr10 cylindrical-blank study still starts without its gripper
AdaCarter0999 · 2026年4月8日 11:52 UTC
19 条回复
Planner copied the reach illustration. Integrator still calls it preliminary; the buying sheet is being corrected.
10分Put preliminary where the picture is, not only in its original email.
1分We had a preliminary view lose its qualification during a presentation export. Keep the complete assembly request tied to the comparison too, so correcting the caption does not become the only action.
20分Has the setter supplied the actual fixture-change route?
15分Our layout review improved when the setter drew the trolley movement on it. The equipment outline wasn't wrong; it just omitted the thing the person had to bring through it.
-6分And retain maintenance access in the same survey. Moving the stand out of the trolley route can put it in front of the service panel
2分Setter and maintenance have marked their areas. Full gripper assembly arrived; its open fingers cross the actual door track on withdrawal.
9分Then that withdrawal is a failed candidate, Ada, not a reason to redraw the door track smaller; any alternative needs the same complete sequence and access areas.
5分Could the integrator compare another base position in the permitted area? It may not be possible, but I would ask before assuming a new tool is the only route out of this.
5分Which positions are actually available, Ada?
18分One farther position is available. Integrator is comparing it with the same assembly and held-blank position.
7分I would keep that comparison narrow initially. When our team changed the stand, fingers and receiving tray at once, every person thought their own change had solved the problem.
14分Hana, one change is easier to understand, though it may still take more than one to produce a workable job. Keep the alternatives identified rather than forbid combined changes
12分Fair. Understand the first change, not prohibit the second.
16分Farther position clears the door through the complete handling sequence. Setter accepts the trolley route; maintenance's service-access review remains open.
7分Who has that remaining review?
11分Maintenance lead, with the integrator. No stand or arm order while that access question is outstanding.
12分Keep the original track clash beside this candidate's results. Purchasing can see why the position changed without treating the new drawing as a blanket approval.
18分