our fr10 cylindrical-blank study still starts without its gripper

AdaCarter0999 · 2026年4月8日 11:52 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

AD
AdaCarter0999
I know the full tool and door are needed. Why has our cylindrical-blank loading study reached the buying sheet with neither shown?

19 条回复

DA
DanielArcher0391

Who promoted that sketch into a recommendation?

15分
AD
AdaCarter0999

Planner copied the reach illustration. Integrator still calls it preliminary; the buying sheet is being corrected.

10分
VI
VictorBrooks0794

Put preliminary where the picture is, not only in its original email.

1分
LI
LiamBarnes0577

We had a preliminary view lose its qualification during a presentation export. Keep the complete assembly request tied to the comparison too, so correcting the caption does not become the only action.

20分
GE
GeorgiaBriggs

Has the setter supplied the actual fixture-change route?

15分
HA
HanaCarter0970

Our layout review improved when the setter drew the trolley movement on it. The equipment outline wasn't wrong; it just omitted the thing the person had to bring through it.

-6分
SA
SarahBarnes0589

And retain maintenance access in the same survey. Moving the stand out of the trolley route can put it in front of the service panel

2分
AD
AdaCarter0999

Setter and maintenance have marked their areas. Full gripper assembly arrived; its open fingers cross the actual door track on withdrawal.

9分
EL
EllaBrooks0816

Then that withdrawal is a failed candidate, Ada, not a reason to redraw the door track smaller; any alternative needs the same complete sequence and access areas.

5分
CH
ChloeChan1092

Could the integrator compare another base position in the permitted area? It may not be possible, but I would ask before assuming a new tool is the only route out of this.

5分
DA
DanielArcher0391

Which positions are actually available, Ada?

18分
AD
AdaCarter0999

One farther position is available. Integrator is comparing it with the same assembly and held-blank position.

7分
HA
HanaCarter0970

I would keep that comparison narrow initially. When our team changed the stand, fingers and receiving tray at once, every person thought their own change had solved the problem.

14分
SA
SarahBarnes0589

Hana, one change is easier to understand, though it may still take more than one to produce a workable job. Keep the alternatives identified rather than forbid combined changes

12分
HA
HanaCarter0970

Fair. Understand the first change, not prohibit the second.

16分
AD
AdaCarter0999

Farther position clears the door through the complete handling sequence. Setter accepts the trolley route; maintenance's service-access review remains open.

7分
GE
GeorgiaBriggs

Who has that remaining review?

11分
AD
AdaCarter0999

Maintenance lead, with the integrator. No stand or arm order while that access question is outstanding.

12分
CH
ChloeChan1092

Keep the original track clash beside this candidate's results. Purchasing can see why the position changed without treating the new drawing as a blanket approval.

18分

讨论已关闭