Who promoted that sketch into a recommendation?
our fr10 cylindrical-blank study still starts without its gripper
AdaCarter0999 · 8 Apr 2026, 11:52 UTC
19 replies
Planner copied the reach illustration. Integrator still calls it preliminary; the buying sheet is being corrected.
10 pointsPut preliminary where the picture is, not only in its original email.
1 pointsWe had a preliminary view lose its qualification during a presentation export. Keep the complete assembly request tied to the comparison too, so correcting the caption does not become the only action.
20 pointsHas the setter supplied the actual fixture-change route?
15 pointsOur layout review improved when the setter drew the trolley movement on it. The equipment outline wasn't wrong; it just omitted the thing the person had to bring through it.
-6 pointsAnd retain maintenance access in the same survey. Moving the stand out of the trolley route can put it in front of the service panel
2 pointsSetter and maintenance have marked their areas. Full gripper assembly arrived; its open fingers cross the actual door track on withdrawal.
9 pointsThen that withdrawal is a failed candidate, Ada, not a reason to redraw the door track smaller; any alternative needs the same complete sequence and access areas.
5 pointsCould the integrator compare another base position in the permitted area? It may not be possible, but I would ask before assuming a new tool is the only route out of this.
5 pointsWhich positions are actually available, Ada?
18 pointsOne farther position is available. Integrator is comparing it with the same assembly and held-blank position.
7 pointsI would keep that comparison narrow initially. When our team changed the stand, fingers and receiving tray at once, every person thought their own change had solved the problem.
14 pointsHana, one change is easier to understand, though it may still take more than one to produce a workable job. Keep the alternatives identified rather than forbid combined changes
12 pointsFair. Understand the first change, not prohibit the second.
16 pointsFarther position clears the door through the complete handling sequence. Setter accepts the trolley route; maintenance's service-access review remains open.
7 pointsWho has that remaining review?
11 pointsMaintenance lead, with the integrator. No stand or arm order while that access question is outstanding.
12 pointsKeep the original track clash beside this candidate's results. Purchasing can see why the position changed without treating the new drawing as a blanket approval.
18 pointsAdd to the discussion
Welcome to Application Robot
Everyone can read the forum. Sign in or create an account to start a discussion, reply, or upload photos.
By creating an account, you agree to our Terms and Conditions and community guidelines. Read our Privacy Policy for how your information is handled.