Which evidence would narrow our UR5e housing-loading stops?

JaneBarnes0597 · 2026年8月17日 06:08 UTC

回复讨论

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

JA
JaneBarnes0597
My UR5e housing-loading ticket with the Alibaba seller is 25 days old. They want more after a phone video. What should connect the message, active step and physical observation to one stop?

3 条回复

OW
OwenBrooks0834

Use an occurrence record with each source's original time, the preceding action, readable message and active step, plus the fitted fixture and program revision. Mark any clock uncertainty instead of silently aligning it. Ask support which retained history they need for that step.

17分
JA
JaneBarnes0597

The phone time and history export are not yet aligned. I'll leave that link uncertain in the request.

9分
OW
OwenBrooks0834

Has support specified a capture method for the next occurrence now? Keep the shift's task to approved observation and preservation of evidence; identifying a fixture-confirmation problem from it is work for the responsible technical people, not an extra operator duty.

1分

参与讨论

欢迎来到 Application Robot

所有人都可以阅读论坛。登录或注册后即可发起讨论、回复或上传照片。

忘记密码?

注册账号即表示你同意我们的 使用条款 和 社区准则。请阅读我们的 隐私政策 ,了解我们如何处理你的信息。