SamAllen0333
I have left correction time open in our FR5 bracket estimate and the operator has shown us the existing fit-up check. The remaining problem is the inspection sheet. It combines measurements taken just after release with measurements after bench correction, without distinguishing them. I cannot estimate how often correction is needed from that column.

14 条回复

EL
EllaBarnes0555

Do not average that column. Can the inspector identify which entries were taken before correction from another source?

18
SA
SamAllen0333

Only for three tagged brackets. The inspector kept those with separate first readings because they were queried. The rest have final readings only.

8
SO
SofiaBaker0456

Those three were selected for trouble, so they won't give you a correction rate.

7
JO
JoChan1114

They can still show what the correction involves, Sam. I've seen a disputed sample get dismissed as unrepresentative and then the next estimate quietly omit the operation again. Keep it for the work description, not the frequency.

11
AD
AdaBarnes0564
回复 JoChan1114

Agreed, Jo. Useful examples, rotten basis for a percentage.

22
SA
SamAllen0333
回复 JoChan1114

The operation is now on the route. Its frequency is still unknown. We are planning a current batch with separate released and post-correction checks tied to each bracket.

11
EL
EllaBarnes0555

Which drawing revision will that batch use? The old sheet is no help if the requirement changed.

18
SO
SofiaBaker0456

And keep the fit-up observations with it, since the fixture designer will need the condition before welding.

7
JO
JoChan1114

Who writes down the correction work itself? An operator should not have to reconstruct it from the inspector's final number afterwards. Even a clear indication that correction happened would beat the current sheet.

24
SA
SamAllen0333
回复 JoChan1114

Ella, drawing revision F. Sofia, fit-up stays linked to the bracket identity. Jo, the operator records correction on the route and inspection adds the subsequent measurement. We have agreed that split for the trial.

15
AD
AdaBarnes0564

Will the corrected and uncorrected brackets stay distinguishable on the bench too?

16
SO
SofiaBaker0456

Good point, Ada. A tidy sheet won't rescue mixed samples.

15
SA
SamAllen0333

Yes, individual tags and separate marked positions while inspection is outstanding. No trial results yet. The estimator has stopped asking me to turn the three queried brackets into a production percentage.

8
EL
EllaBarnes0555

Please post the eventual split. Especially whether the ordinary brackets need the same correction as those three.