Which released-bracket measurement belongs in our fixture estimate?

SamAllen0333 · 8 Nov 2025, 00:01 UTC

Closed
SA
SamAllen0333
I have left correction time open in our FR5 bracket estimate and the operator has shown us the existing fit-up check. The remaining problem is the inspection sheet. It combines measurements taken just after release with measurements after bench correction, without distinguishing them. I cannot estimate how often correction is needed from that column.

14 replies

EL
EllaBarnes0555
Replying to SamAllen0333

Do not average that column. Can the inspector identify which entries were taken before correction from another source?

18 points
SA
SamAllen0333
Replying to EllaBarnes0555

Only for three tagged brackets. The inspector kept those with separate first readings because they were queried. The rest have final readings only.

8 points
SO
SofiaBaker0456
Replying to SamAllen0333

Those three were selected for trouble, so they won't give you a correction rate.

7 points
JO
JoChan1114
Replying to SamAllen0333

They can still show what the correction involves, Sam. I've seen a disputed sample get dismissed as unrepresentative and then the next estimate quietly omit the operation again. Keep it for the work description, not the frequency.

11 points
AD
AdaBarnes0564
Replying to JoChan1114

Agreed, Jo. Useful examples, rotten basis for a percentage.

22 points
SA
SamAllen0333
Replying to JoChan1114

The operation is now on the route. Its frequency is still unknown. We are planning a current batch with separate released and post-correction checks tied to each bracket.

11 points
EL
EllaBarnes0555
Replying to SamAllen0333

Which drawing revision will that batch use? The old sheet is no help if the requirement changed.

18 points
SO
SofiaBaker0456
Replying to SamAllen0333

And keep the fit-up observations with it, since the fixture designer will need the condition before welding.

7 points
JO
JoChan1114
Replying to SamAllen0333

Who writes down the correction work itself? An operator should not have to reconstruct it from the inspector's final number afterwards. Even a clear indication that correction happened would beat the current sheet.

24 points
SA
SamAllen0333
Replying to JoChan1114

Ella, drawing revision F. Sofia, fit-up stays linked to the bracket identity. Jo, the operator records correction on the route and inspection adds the subsequent measurement. We have agreed that split for the trial.

15 points
AD
AdaBarnes0564
Replying to SamAllen0333

Will the corrected and uncorrected brackets stay distinguishable on the bench too?

16 points
SO
SofiaBaker0456
Replying to AdaBarnes0564

Good point, Ada. A tidy sheet won't rescue mixed samples.

15 points
SA
SamAllen0333
Replying to AdaBarnes0564

Yes, individual tags and separate marked positions while inspection is outstanding. No trial results yet. The estimator has stopped asking me to turn the three queried brackets into a production percentage.

8 points
EL
EllaBarnes0555
Replying to SamAllen0333

Please post the eventual split. Especially whether the ordinary brackets need the same correction as those three.

24 points