New robot stand would block the machine's cleaning access

EmmaBarnes0550 · 2025年1月16日 18:02 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

EM
EmmaBarnes0550
We once installed a fixture cupboard over a service hatch and lived with the nuisance for years. Now our FR10 tending sketch puts the stand beside another hatch, plus the open door and gripper aren't drawn. Can I get access and loading reviewed together before the base position becomes fixed?

12 条回复

SO
SofiaArcher0369

Absolutely, bring the maintenance access into the same drawing. Otherwise the hatch gets discovered after the anchor holes, which is a very expensive way to update a sketch.

21分
EM
EmmaBarnes0550

Maintenance marked the hatch swing and space for removing the basket. It's more than the open panel itself.

5分
SO
SofiaArcher0369

That basket is exactly the sort of thing a flat outline forgets. Does the alternative base position still leave a route for carrying it away?

18分
EM
EmmaBarnes0550

There's a route behind the proposed stand, but it narrows by the door handle. We've finally got measured positions for both.

9分
SO
SofiaArcher0369

Useful progress. Have you now got the gripper model as well, or is the robot review still working with an empty wrist?

12分
JO
JoFixtures

Include the brass blank in that model, a short tool can still carry a part that catches the opening on withdrawal, especially if its orientation changes.

12分
SO
SofiaArcher0369
回复 JoFixtures

Yes, loaded geometry is what I meant, thanks for making that explicit. An empty gripper check would leave half the question unanswered.

4分
DA
DanLoop

Who signs off the revised geometry supplied to the motion reviewer? An accurate measurement is of little help if the reviewer uses last week's attachment.

11分
EM
EmmaBarnes0550
回复 DanLoop

I've numbered the layout revisions and sent one agreed file through the project lead. Toolmaker has supplied occupied and open-finger outlines for that revision.

3分
LE
LeahAli0234

Our cleaners inherited an access route that only worked without the waste trolley. Get whoever empties the basket to walk through the proposed space with their normal equipment while it's still a floor marking.

19分
SO
SofiaArcher0369

Did that walk-through change the stand position again? I'm invested in the basket's future now, it's had more scrutiny than some whole installations.

17分
EM
EmmaBarnes0550

It did. Trolley needed a turn we hadn't allowed. Revised position clears that route; the integrator still has to confirm loaded tool access, so no base holes yet.

17分

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .