We once installed a fixture cupboard over a service hatch and lived with the nuisance for years. Now our FR10 tending sketch puts the stand beside another hatch, plus the open door and gripper aren't drawn. Can I get access and loading reviewed together before the base position becomes fixed?
Absolutely, bring the maintenance access into the same drawing. Otherwise the hatch gets discovered after the anchor holes, which is a very expensive way to update a sketch.
Include the brass blank in that model, a short tool can still carry a part that catches the opening on withdrawal, especially if its orientation changes.
Who signs off the revised geometry supplied to the motion reviewer? An accurate measurement is of little help if the reviewer uses last week's attachment.
I've numbered the layout revisions and sent one agreed file through the project lead. Toolmaker has supplied occupied and open-finger outlines for that revision.
Our cleaners inherited an access route that only worked without the waste trolley. Get whoever empties the basket to walk through the proposed space with their normal equipment while it's still a floor marking.
It did. Trolley needed a turn we hadn't allowed. Revised position clears that route; the integrator still has to confirm loaded tool access, so no base holes yet.