简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

Bracket passed after correction, first released reading missing

GraceCarter1016 · 2026年2月14日 09:08 UTC

已关闭
GR
GraceCarter1016
Our UR5e proposal inherits final passes. No first released readings. Cannot price how much correction those passes needed.

12 条回复

LI
LiamBaker0490

Can fabrication recover any linked correction records, or do you only have inspection's final results? Don't estimate the rate from whichever bad bracket somebody remembers.

24
GR
GraceCarter1016

Only final inspection results linked by bracket. Fabrication's correction notebook lists a shift total, no bracket identities.

19
AN
AnnaArcher0416

Our new traveller needed the first released measurement for exactly this reason. A final pass was doing too much work in the spreadsheet. Keep the incoming fit-up and fixture seating separate, then follow the same bracket through first release, any correction and the return check.

15
TO
TobyBell0666

Can the old shift total still inform the labour budget as an unallocated total, provided nobody presents it as a per-bracket correction rate?

2
SO
SofiaBell0630

Toby, possibly, but Grace needs to know what else that shift total includes before using it. Waiting, several product types, or work done by a second person could change the interpretation.

23
GR
GraceCarter1016

Notebook includes two bracket types and waiting for inspection. Useful workload note, not a correction time for this assembly.

15
LI
LiamBaker0490

Then keep it beside the study plan, not inside a calculated correction rate. Who is choosing the current samples?

7
GR
GraceCarter1016

Process specialist with quality. Both permitted fit-up extremes included. Current drawing and fixture set identified.

7
AN
AnnaArcher0416

Who will write down the first released result before correction starts? That is the entry we kept losing between fabrication and inspection.

15
SO
SofiaBell0630

And make that practical for the person doing it. A form located at the final inspection desk won't capture an earlier stage by wishful thinking.

17
GR
GraceCarter1016

Inspector records first release at the agreed check station. Fabrication records correction; inspection records return result. Study not run yet.

0
TO
TobyBell0666

That gives purchasing a defined study to cost, while the old mixed shift total stays visible without pretending it answers the assembly question.

6

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .