简体中文界面。帖子、指南及政策正文保留原文;未对原文作自动翻译。

The correction note has outlived its explanation

AmyBaker0467 · 2025年6月5日 06:40 UTC

已关闭
AM
AmyBaker0467
Our FR5 bracket proposal copies an old fixture adjustment, although the records only show clamped alignment and loose-part failures. I'd like the missing measurement story understood before the adjustment becomes somebody else's standard method.

13 条回复

CA
CallumChen1143

We found different measurement references mixed into our old bracket folder; can you tell what each of your two checks measured from?

11
AM
AmyBaker0467

The clamped one uses the fixture base. The loose one gives a number with no sketch. So no, not yet.

4
CA
CallumChen1143

Could the old inspector identify the checking kit from a photograph? That got our search moving without trying to recreate the whole job

6
AA
AaronBarnes0523

Keep the unknown reference beside the old result. A finished-part check defined from the current drawing will give quality a clearer starting point for the retained samples.

8
AM
AmyBaker0467

Photos sent to the inspector. Quality has picked the traceable current-revision samples for a fresh check. Some of the old parts have no identities.

13
AM
AmyBaker0467

The inspector recognised the plate, but says it was used before correction. There's a second measurement step missing from the papers we have.

9
CA
CallumChen1143

Did they say what the correction involved?

15
MA
MayaAdams0127

Ask about the component revisions too. My recent jig mystery included a different gusset, and I nearly copied the old fit-up aid into the new design before spotting that.

1
MA
MayaAli0214

Is the correction work included anywhere in the proposed staffing or floor space? I would leave that open while you investigate, rather than let a missing record become zero work in the estimate.

19
CA
CallumChen1143

Amy, have you found any final readings taken after that correction? Even one traceable example might explain what they were trying to achieve.

19
AM
AmyBaker0467

No final readings yet. The inspector remembers a separate adjustment bench but not the details. Planning has left that work open, and tooling is checking the component revisions.

20
AM
AmyBaker0467

Current sample measurements are back: one misses the drawing height. The copied adjustment is still excluded. We need a defined process for this bracket, not a guessed explanation for the old one.

7
AA
AaronBarnes0523

Have quality attach the measurement setup to those results. It will help the fixture review stay anchored to the current part while the historical questions remain open.

5

讨论已关闭

此讨论已连续六个月没有活动,现已关闭新回复。 最后活动: .