What staff time belongs in my fixture-unloading pilot?

SofiaBell0630 · 2025年2月18日 06:01 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

SO
SofiaBell0630
I priced a UR5e and gripper for unloading connector housings, then showed the total to our production lead. She asked who makes the fixture, covers training and handles interruptions. Fair enough, my 'pilot cost' had a very selective memory. I'd like to propose one housing type and a limited supervised trial, with a budget that includes our own time. What would you make explicit before we agree it?

3 条回复

MA
MayaChen1171

Who will run the trial after you finish setting it up? Put that person's preparation and support time into the scope too.

22分
SO
SofiaBell0630

Our assembly technician would run it, and hadn't been included in the estimate at all. We've now allowed time for her to review the workstation and trial a changeover. Fixture design is a separate quoted task. The lead is willing to review that version.

17分
MA
MayaChen1171

What result would make you stop? Agree that before the hours are spent, while everyone can still answer honestly.

17分