Machine supplier means request received. Integrator means loading area available. Both call it ready. Our handover cannot use that.
Give those events separate names, then have both teams walk through request received while loading is still unavailable. Define the ordinary interface ownership and the unresolved-wait response without letting either label stand in for the independently engineered safety conditions.