Our FR10 plan calls receipt and loading access ready

JackChan1124 · 1 Feb 2026, 13:18 UTC

Closed
JA
JackChan1124
Machine supplier means request received. Integrator means loading area available. Both call it ready. Our handover cannot use that.

1 reply

JA
JasperChan1073
Replying to JackChan1124

Give those events separate names, then have both teams walk through request received while loading is still unavailable. Define the ordinary interface ownership and the unresolved-wait response without letting either label stand in for the independently engineered safety conditions.

13 points

Discussion closed

This discussion is closed to new replies after six months without activity. Last activity: .