FR10 restart with a block already in the destination

NinaChen1197 · 2025年12月13日 20:19 UTC

已关闭

主帖中文翻译暂不可用,以下显示英文原文;回复保留原文。 查看英文原文

NI
NinaChen1197
I can't rely on our saved pocket after an interrupted transfer. On the bench the block had reached its destination, but restarting the FR10 job offered the same placement again. I've kept the job out of production. What should the integrator define besides moving the point where the pocket gets saved?

1 条回复

JO
JonasAbbott0024

Ask how the program represents an uncertain transfer and how the physical state is reconciled before continuation, including who does that work; saving earlier can create a different mismatch, so I would want the stop points walked through rather than one line moved and called recovery.